Select construction materials

Little of this can be handed to software today.

Software can assemble the case and recommend an answer, and that is genuinely useful. The decision stays with a person because someone has to be accountable for it. Treating the recommendation as the decision is how automation projects fail.

Key facts about this work activity
How automatableBarely automatable
Kind of workJudgment, authorisation and strategy
Jobs that do it12 occupations
Tool categories that applyGeneralist agents, Models and routing
O*NET activityMaking Decisions and Solving Problems (4.A.2.b.1)

What this looks like on the job

Not our paraphrase. These are real task statements recorded against this activity, spread across the 12 occupations that perform it.

  • Select and order lumber or other required materials.
  • Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
  • Select the correct sealing compound or tape.
  • Select the type or color of glass or mirror according to specifications.
  • Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
  • Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
  • Select pipe sizes, types, or related materials, such as supports, hangers, or hydraulic cylinders, according to specifications.
  • Select gauges or types of sheet metal or nonmetallic material, according to product specifications.
  • Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.
  • Select tools, equipment, or materials from storage and transport items to work site.
  • Requisition tools and equipment, select type and size of pipe, and collect and transport materials and equipment to work site.
  • Organize materials to prepare for use.
  • Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
  • Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.

What we would actually use

One recommendation rather than a shortlist, because a shortlist is just your problem handed back. This is what we would buy for judgment, authorisation and strategy, and what it costs.

Our pickFrom $20/mo · nothing else needed

There is nothing here worth buying beyond a good assistant. Software assembles the case and recommends an answer, which any $20 assistant already does; the decision is yours, and no product on this page changes that.

Chosen for the cheapest thing that does the job, not the best funded. Nothing on this site is sponsored, and the full landscape is there when you want to disagree with us.

The rest of the category

Context, not alternatives to weigh up. We name the layer rather than promise a named product does your specific task.

Generalist agents

From $20/mo
From $20/mo
From $20/mo
From $24.99/mo

Models and routing

Usage-based
Open source
Usage-based
Usage-based

Matched from the kind of work, not from vendor marketing. Check any of them can reach the system your records actually live in — that connection, not the model, is where these projects stall.

Work that goes with it

O*NET groups these under “Select materials or equipment for operations or projects”. In practice they tend to be done by the same person, in the same sitting.

Related work activities
ActivityJobs
Select educational materials or equipment39
Select production equipment according to product specifications24
Select production input materials20
Select tools, equipment, or technologies for use in operations or projects13
Select materials or props12
Select resources needed to accomplish tasks8
Select project materials7
Select construction equipment7

Method. The activity, its taxonomy placement and the occupations that perform it come straight from the public-domain O*NET 30.3 database. The automatability band is ours: we map each of O*NET’s 41 generalized work activities to how much of its output current software can produce, assuming a person still reviews and owns the result. It is a coarse three-way judgment on purpose. A precise-looking percentage here would be invented.