Insulation Workers, Floor, Ceiling, and Wall, task by task.

Every activity this job is made of, scored on how much of its output software can produce today and linked to what addresses it. What is left over is the job.

SOC code
47-2131.00
Activities scored
6
Handed to agents
3
Grounded in
O*NET 30.3
The tasks · Insulation Workers, Floor, Ceiling, and WallSOC 47-2131.00
85% · agent
80% · agent
Surface preparation planningWhat can do this →
75% · agent
15% · you keep
10% · you keep
Hazardous material removalWhat can do this →
5% · you keep
The team3 agents · 3 need no setup
Blueprint Analysis Agent
NAIMA 3E Plus · Microsoft Excel · Docs
● No integration needed
Material Calculator
Comput-Ability Mechanical Insulation Key Estimator · Microsoft Excel · Sheets
● No integration needed
Surface Prep Planner
Microsoft Office software · Docs · Sheets
● No integration needed
You keep this
Perform hands-on insulation installation and fittingOperate blowers and material distribution equipment on-siteExecute safe removal of hazardous materials like asbestosEnsure quality and safety compliance during physical work

Automatability scores estimate how much of a task an agent can reliably do today, grounded in O*NET task data. They are not predictions of job loss.

Start with these three.

The most automatable work in this job, and what actually addresses it. Each one has a page of its own showing every occupation that does it.

Material measurement and cutting calculations80% · analysis and evaluation work · mostly automatable
Surface preparation planning75% · physical, manual and inspection work · barely automatable
No software category addresses thisWhy not