Collaborate with technical specialists to resolve design or development problems
Part of the output can be produced by software today.
An agent can propose the plan, chase the replies and keep the record current. To actually change anything it needs write access to a calendar or work system, and a person still owns the tradeoffs when two plans collide.
| How automatable | Partly automatable |
|---|---|
| Kind of work | Scheduling, planning and resource control |
| Jobs that do it | 8 occupations |
| Tool categories that apply | Tools and auth, Builders |
| O*NET activity | Coordinating the Work and Activities of Others (4.A.4.b.1) |
What this looks like on the job
Not our paraphrase. These are real task statements recorded against this activity, spread across the 8 occupations that perform it.
- Confer with process engineers, plant operators, flavor experts, and packaging and marketing specialists to resolve problems in product development.
- Consult with engineers or other technical personnel working on construction projects about the effects of soil problems and possible solutions to these problems.
- Confer with departments, such as marketing, business development, or operations, to coordinate product development or improvement.
- Confer with information technology specialists to develop computer applications for genetic data analysis.
- Coordinate work with economic consultants or architects during the formulation of plans or the design of large pieces of infrastructure.
- Collaborate with economic development planners to decide on the implementation of proposed development policies, plans, and programs based on culturally institutionalized barriers and facilitating circumstances.
- Collaborate with engineers to research, analyze, or resolve complex transportation design issues.
- Consult with remote sensing scientists, surveyors, cartographers, or engineers to determine project needs.
- Collaborate with software developers in the development and modification of commercial bioinformatics software.
- Collaborate with other professionals to develop sustainable transportation strategies at the local, regional, or national level.
What we would actually use
One recommendation rather than a shortlist, because a shortlist is just your problem handed back. This is what we would buy for scheduling, planning and resource control, and what it costs.
Scheduling is a connector problem rather than an intelligence one, and $9 a month of Make covers both the calendar and the chasing. An agent platform priced per seat adds nothing you would notice here.
Chosen for the cheapest thing that does the job, not the best funded. Nothing on this site is sponsored, and the full landscape is there when you want to disagree with us.
The rest of the category
Context, not alternatives to weigh up. We name the layer rather than promise a named product does your specific task.
Matched from the kind of work, not from vendor marketing. Check any of them can reach the system your records actually live in — that connection, not the model, is where these projects stall.
How people actually do it
No workflow names this activity yet, but these automate the same kind of work, with the prompts to paste and what to keep for yourself.
Who does this work
8 occupations in the O*NET database perform this activity. Each one has a full breakdown of its other tasks.
Work that goes with it
O*NET groups these under “Coordinate with others to resolve problems”. In practice they tend to be done by the same person, in the same sitting.
Method. The activity, its taxonomy placement and the occupations that perform it come straight from the public-domain O*NET 30.3 database. The automatability band is ours: we map each of O*NET’s 41 generalized work activities to how much of its output current software can produce, assuming a person still reviews and owns the result. It is a coarse three-way judgment on purpose. A precise-looking percentage here would be invented.