Floor Layers, Except Carpet, Wood, and Hard Tiles, task by task.

Every activity this job is made of, scored on how much of its output software can produce today and linked to what addresses it. What is left over is the job.

SOC code
47-2042.00
Activities scored
6
Handed to agents
3
Grounded in
O*NET 30.3
The tasks · Floor Layers, Except Carpet, Wood, and Hard TilesSOC 47-2042.00
85% · agent
80% · agent
Cost estimation and takeoffsWhat can do this →
78% · agent
Surface preparation workWhat can do this →
15% · you keep
12% · you keep
Physical flooring applicationWhat can do this →
8% · you keep
The team3 agents · 3 need no setup
Project planning agent
Flooring Technologies QFloors · On Center On-Screen Takeoff · Project visualization software
● No integration needed
Measurement and layout agent
Measure Square FloorEstimate Pro · Sheets · Project visualization software
● No integration needed
Cost estimation agent
CPR Software FloorCOST Estimator for Excel · On Center On-Screen Takeoff · Sheets
● No integration needed
You keep this
Perform all physical surface preparation and cleaningExecute hands-on cutting, fitting, and installation of flooring materialsApply adhesives and operate equipment safely on-siteEnsure quality control and final project completion

Automatability scores estimate how much of a task an agent can reliably do today, grounded in O*NET task data. They are not predictions of job loss.

Start with these three.

The most automatable work in this job, and what actually addresses it. Each one has a page of its own showing every occupation that does it.

Project planning and estimation85% · physical, manual and inspection work · barely automatable
No software category addresses thisWhy not
Material measurement and layout80% · analysis and evaluation work · mostly automatable